Selected experience

Projects & Case Studies

A selection of commissions delivered across the UK and internationally — spanning quantity surveying, BIM, commercial and project management on landmark and specialist projects.

United Kingdom

05
Battersea Power Station — Mixed-Use RegenerationMixed-Use Regeneration
London, United Kingdom

Battersea Power Station

BIM Coordinator

J. Coffey Construction (structural package to Mace)

Supported the BIM Manager on one of London's largest regeneration schemes, contributing to the daily use of project information and BIM processes for the structural package. Helped develop a 4D simulation of the structural scope — sequencing construction against programme under the Level 2 BIM protocol.

  • 4D structural simulation
  • Level 2 BIM protocol
  • Information management
Soapworks — Ministry of Justice — Government / WorkplaceGovernment / Workplace
MediaCityUK, United Kingdom

Soapworks — Ministry of Justice

Researcher — MSc Dissertation

Ministry of Justice · University of Salford

A six-month MSc research study at the Ministry of Justice exploring the benefits of Government Soft Landings (GSL) on BIM-aligned projects. Evaluated the PRINCE2 project-management structure adopted at MoJ against traditional approaches, capturing the operational and handover benefits of a soft-landings methodology.

  • Government Soft Landings
  • PRINCE2 evaluation
  • BIM-aligned delivery
Church of the Ascension — Heritage / Low-CarbonHeritage / Low-Carbon
Lower Broughton, Salford, UK

Church of the Ascension

Value Engineering Researcher

Parish Church Council

Comparative feasibility study and design proposals for renewable-energy options within the rebuild programme of the Grade II-listed Church of the Ascension. Carried out a value-engineering exercise on stained-glass window panels and their impact on the building's energy consumption.

  • Renewable-energy feasibility
  • Grade II-listed heritage
  • Value engineering
Demonstrator Modular Home — Residential / MMCResidential / MMC
United Kingdom

Demonstrator Modular Home

Quantity Surveyor

Comfortable Living Ltd.

Quantity surveying and time-and-motion studies for a prefabricated demonstrator two-bedroom modular home. Measured process (takt) time across all construction activities and performed a detailed review and analysis of the cost plan — benchmarking modern methods of construction.

  • Takt-time measurement
  • MMC cost analysis
  • Cost-plan review
Newlands House & Oakhill Clinic — Healthcare / ConversionHealthcare / Conversion
United Kingdom

Newlands House & Oakhill Clinic

Construction Programming

Tydewell Ltd.

Developed the construction-stage works programme across buildings A, B, C and D for the Newlands House and former Oakhill Clinic development — sequencing the works packages for coordinated delivery.

  • Construction-stage programme
  • Multi-building sequencing

International

02
Taj Samudra Hotel — Hospitality (5-Star)Hospitality (5-Star)
Colombo, Sri Lanka

Taj Samudra Hotel

Commercial Manager

Taj Hotels

Commercial manager within the projects team for the refurbishment of the landmark Taj Samudra city hotel — controlling cost and contract through a live, occupied five-star environment.

  • Live occupied refurbishment
  • Cost & contract control
  • 5-star hospitality
Renuka Organic Factory & Warehouse — IndustrialIndustrial
Watupitiwala FTZ, Sri Lanka

Renuka Organic Factory & Warehouse

Projects Manager

Renuka Group

Projects manager engaged from the early design stage for a large coconut-products factory and warehouse. Developed contract documents, subcontract agreements and construction progress schedules, and implemented cost-control and measurement systems. The facility comprised circa 3,300 m² of storage (≈7,000 pallet positions) plus a two-storey factory and office building with mezzanine production and staff facilities.

  • Early-stage engagement
  • Contract documentation
  • Cost-control systems

Selected partners & clients

University of SalfordMaceMinistry of JusticeTaj HotelsRenuka GroupWise Property RefurbishmentNu-lok Roofing Systems

The BIM advantage

What our BIM approach delivers

Twelve concrete benefits our clients get from BIM-aligned delivery — from the golden thread of design intent through to measured post-occupancy performance.

01

The golden thread

BIM is a key element of design and construction, maintaining the golden thread of the building's purpose through to delivery and operation.

02

Early end-user engagement

End users are engaged early and throughout, with a BIM champion embedded on the project team during design and construction.

03

Committed aftercare

The design and construction team commits to aftercare post-construction — not just handover and walk away.

04

Post-occupancy feedback

Post-occupancy evaluation feeds lessons learnt back to the design and construction team and into future projects.

05

FM-ready asset data

A fully populated asset data set feeds directly into FM systems, with modelling that supports planning modifications across the building life cycle.

06

Buildings that perform

The outcome is a building that meets end-user needs and required operational outcomes — measured, not assumed.

07

Early design challenge

Design decisions that would impact ongoing maintenance and operating cost are challenged early, while change is still cheap.

08

Whole-life cost focus

Most asset expenditure happens over the lifecycle, not the capital phase — operational cost impacts are considered from day one.

09

Smooth commissioning & handover

Training, commissioning and handover are planned early, cutting protracted handovers and reaching optimal building performance sooner.

10

Measured performance

Clear building-performance measures are monitored up to three years post-completion, with remedy mechanisms where performance is not met.

11

Proven savings

As early adopters of BIM, we have identified significant time and cost savings on new-build and refurbishment projects in the UK and internationally.

12

Less waste, less delay

Estimating, detailed BOQs and commercial assistance delivered in line with the Level 2 BIM protocol help minimise waste and delay.

Resource personnel

The network behind our projects

Our strength is our knowledge, experience and ability to deliver project goals successfully — a multidisciplinary team of chartered architects, engineers, services engineers and BIM-qualified quantity surveyors.

N. Narendra Vasudeva

Director

MSc (BIM), BSc (Hons) QS (UK), Dip. Commercial Arb. (SL), ICIOB

Leads contracts and project management from letter of intent to successful handover — contract negotiation with clients, consultants and contractors, resource and cost planning, claims and variations, and enforcement of contractual obligations while avoiding contractual risk.

Deepali Kirtikumar Mody

Chartered Architect

Senior Architect — Hyundai E&C, John Keells Waterfront

Led shop-drawing teams, value-engineering proposals and design coordination across MEP and structural disciplines on one of Sri Lanka's largest mixed-use projects, with deep knowledge of local practice and building regulations.

Rohan Saputhanthri

Chartered Building Services Engineer

BSc Eng, CEng, MIE (SL), LEED GA (USA), MASHRAE (USA)

Fifteen years across design, estimation, testing, commissioning and project management of MEP services — star-class hotels, hospitals, airports, and high-rise commercial and residential towers in Sri Lanka and overseas.

Sarathchandra Samarasekara

Measurement Engineer

BSc (Eng), MSc (Project Management)

Measurement engineering and engineering consultancy, including major infrastructure such as the Moragolla Hydropower Project with Nippon Koei.